PPL Shipyard – Construction of Toilet

PPL Shipyard – Construction of Toilet

Excavation, Plumbing Installation & Concrete Foundation Works at PPL Shipyard

Our team was appointed to carry out excavation, plumbing installation and concrete foundation works within PPL Shipyard, supporting the facility’s broader infrastructure upgrades. The project required precise ground preparation, coordinated pipe routing and structurally sound casting works, all executed under controlled site conditions to maintain operational safety and performance.

Structural Shelter Erection Using Steel Framing & Roofing

A new steel-framed shelter was erected to provide durable overhead protection for the work zone, complete with roofing installation and structural anchoring. The coordinated sequencing of lifting, alignment and fastening reflects the same construction discipline we apply as an A&A contractor in Singapore, ensuring the structure meets safety, load and operational requirements before commissioning.

Wall Construction, Cubicle Installation & Final Interior Fit-Out

Internal walls were constructed and aligned to form the new layout, followed by the installation of cubicles, fittings and accessories required for operational use. These reinstatement works follow similar coordination and quality controls seen in our A&A works in Singapore, ensuring the completed space is functional, durable and ready for handover.